人工挖孔桩混凝土浇筑新工艺

New Technology for Concrete Pouring of Artificial Digging Pile
下载PDF
导出
摘要 人工挖孔桩桩身混凝土干桩浇筑法施工效率低,工序转换频繁,孔下作业时间长、安全风险大;清水桩浇筑法效率较高,工序转换较少,孔下作业时间短,但可视性较差,易出现堵管、导管提空反水及过程处理困难等一系列施工问题,从而影响混凝土浇筑质量。为解决上述问题,提出一种适用于人工挖孔桩桩身混凝土浇筑的无水水下混凝土浇筑施工方法,该法具有可视性好、效率高、安全性好、质量可控、施工问题易处理等优点,节约施工成本。 The dry pile pouring method of the concrete of the artificial digging pile body has low construction efficiency,frequent process conversion,long time for workers under the hole,and high safety risks.Clear concrete pouring method has high construction efficiency less process conversion,no need for the construction staff to work under the hole for a long time,but it has poor visibility,and is prone to a series of construction problems such as pipe blocking,pipe lifting and backwatering,and difficult process treatment,which affects the concrete pouring quality.In order to solve the above problems,this paper proposes an anhydrous underwater concrete pouring construction method suitable for concrete of artificial digging of piles.It has good visibility,high efficiency,good safety,controllable quality,low construction costs and is easy to deal with construction problems.
作者 赵晓光 ZHAO Xiaoguang(Sichuan Zhitong Road&Bridge Engineering Technology Co.,Ltd.,Chengdu 610031;Sichuan Road&Bridge(Group)Co.,Ltd.,Chengdu 610041)
出处 《公路交通技术》 2020年第3期78-82,共5页 Technology of Highway and Transport
关键词 人工挖孔桩 干桩 无水水下混凝土 artificial digging pile dry pile anhydrous underwater concrete
  • 相关文献

参考文献15

二级参考文献37

共引文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部