地铁盾构隧道近距离下穿危大拱桥安全评估及施工应对措施 被引量:6

Analysis and Research on Safety Assessment and Construction Countermeasures of Shield Tunnel Passing Through Dangerous Large Arch Bridge within Close Range
下载PDF
导出
摘要 近年来,城市轨道交通工程邻接既有地下结构物进行邻接施工的工程大量涌现。在这种情况下,施工中对既有结构物的影响以及自身近距离施工时相互影响的安全评估已成为城市轨道交通工程施工中需要解决的关键问题。以合肥轨道交通3号线工程为例,针对城市轨道交通盾构隧道近距离下穿危大拱桥存在的主要风险及影响因素进行分析研究,提出相应的应对措施。 In recent years,urban rail transit projects concerning abutment constructions that abuts existing underground structures have been springing out enormously.Under this circumstance,the safety assessment of both the impact on existing structures and the interactive influence between each other from construction within close range have become the key problem to be solved.Hefei rail transit line 3 was adopted as an example,where the main risks and influencing factors of building shield tunnel passing through the dangerous large arch bridge were analyzed and studied,and the corresponding countermeasures were put forward.
作者 谢胡明 XIE Huming(China Railway 12 Bureau Group Co.,Ltd.,030024,Taiyuan,China)
出处 《城市轨道交通研究》 北大核心 2020年第6期107-111,共5页 Urban Mass Transit
基金 安徽省自然科学基金项目(JZ2018AKZR0023) 安徽省测绘局2018测绘科技专项项目(W2018JSFW0629)。
关键词 城市轨道交通 盾构隧道 邻接施工 危大拱桥 安全评估 urban rail transit tunnel shield abutment construction dangerous large arch bridge safety assessment