期刊文献+

DDS桩在高速铁路复合地基工程中的适用性 被引量:2

Adaptability of DDS Pile to Composite Foundation Projects on High Speed Railway
下载PDF
导出
摘要 结合铁路建设工程实际,选择不同地质和工况条件的施工区段,对DDS桩(全螺纹灌注挤土桩)和CFG桩(水泥粉煤灰碎石桩)进行复合地基载荷试验,对比分析2种桩在复合地基加固效果上的差异;对DDS桩进行实体取芯、局部开挖,研究其未达到预期效果的原因.结果表明:地质条件、工装设备和工艺直接影响DDS桩的成桩质量和加固效果;桩底和桩身螺纹质量是保证复合地基处理效果的关键;在承载力以短桩端承力为主的加固区段不宜采用DDS桩技术进行复合地基处理;在承载力以长桩摩擦力为主的加固区段可采用DDS桩技术,但须采取改进措施. Combined with the actual situation of railway construction engineering,the construction sections with different geological and working conditions were selected to carry out composite foundation load tests on drilled displacement piles with a screw-shaped shaft(DDS piles)and cement fly-ash gravel piles(CFG piles).The difference between the two kinds of pile composite foundation reinforcement effect was analyzed,solid coring and local excavation was carried out for DDS pile,and the reason why DDS pile fails to achieve the expected effect was studied.The results show that geological conditions,tooling equipment and technology directly affect the quality of DDS pile and the effect of reinforcement,the quality of screw thread of pile bottom and pile body is the key to achieve the effect of composite foundation treatment,DDS pile technology should not be used for composite foundation treatment in the reinforcement section with short pile end bearing capacity as the main bearing capacity,DDS pile technology can be used in the reinforcement section with long pile friction as the main bearing capacity,but the measures must be improved.
作者 赵治冶 ZHAO Zhiye(Shandong Railway Investment Holding Group Co.Ltd.,Ji’nan 250102,China)
出处 《铁道建筑》 北大核心 2020年第5期77-79,共3页 Railway Engineering
关键词 高速铁路 复合地基加固 现场试验 全螺纹灌注挤土桩 适用性 复合地基载荷 high speed railway composite foundation reinforcement field test drilled displacement piles with a screw-shaped shaft(DDS piles) adaptability composite foundation load
  • 相关文献

参考文献6

二级参考文献38

共引文献98

同被引文献14

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部