双曲线钢管拱施工技术 被引量:2

Construction Technology of Hyperbolic Steel Pipe Arch
下载PDF
导出
摘要 渝黔铁路夜郎河大桥主桥为1×370m上承式钢管拱刚性骨架混凝土提篮拱桥。其钢管拱采用双曲线线形,需一次加工成型,加工工艺复杂,线形控制难度高。在考虑既有场地、加工工艺和吊装难点等诸多因素情况下,落实具体施工方案,解决施工难题,实现了大跨度双曲线钢管拱加工制造安装的目的。 The main bridge of the Yelanghe bridge on the Chongqing to Guizhou railway is a 1 ×370 m upright steel tube arch rigid skeleton concrete basket arch bridge. The steel pipe arch adopts a hyperbolic line shape, which requires one-time processing and molding. The processing technology is complicated, and the line shape control is difficult. Taking into account many factors such as the existing site, processing technology and lifting difficulties, the specific construction plan was implemented to solve the construction difficulties, which realized the purpose of manufacturing and installing large-span hyperbolic steel pipe arches.
作者 杨希富 YANG Xi-fu(Harbin Railway Construction Group Co.Ltd.of China Railway 22nd Bureau,Harbin 150001,China)
出处 《工程建设与设计》 2020年第8期181-182,共2页 Construction & Design for Engineering
关键词 双曲线型 3+1弦管加工 桥位合龙 控制工艺 hyperbola 3+1 chord tube processing bridge closing control technology
  • 相关文献

参考文献4

二级参考文献16

共引文献8

同被引文献3

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部