期刊文献+

综采工作面顶板管理控制技术探讨 被引量:2

Discussion on Roof Management and Control Technology of Fully Mechanized Mining Face
下载PDF
导出
摘要 以综采工作面顶板管理控制技术为对象开展探究。结合具体工程实际,从初采阶段顶板控制、过空巷顶板控制、末采阶段顶板控制三方面对综采作业过程中的顶板管控开展了针对性的分析探究,实现了对顶板的有效控制,希望能够为其他矿井相似工程的开展提供借鉴和参考。 This paper explored the roof management and control technology of the fully mechanized mining face.Combined with the specific engineering practice,it analyzed and explored the roof control in the process of fully mechanized mining from three aspects of the roof control in the initial mining stage,the roof control during passing through the abandoned roadway and the roof control in the final mining stage,and realized the effective control of the roof,hoping to provide reference for the similar projects in other mines.
作者 杨彬 YANG Bin(Sijiazhuang Coal Industry Co.,Ltd.,Yangquan Coal Industry Group of Shanxi,Xiyang 045300,Shanxi,China)
出处 《能源与节能》 2020年第4期123-124,共2页 Energy and Energy Conservation
关键词 综采工作面 顶板管理 初采阶段 过空巷 末采阶段 fully mechanized mining face roof control initial mining stage passing through the abandoned roadway final mining stage
  • 相关文献

参考文献6

二级参考文献41

共引文献77

同被引文献13

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部