深基坑工程中,如遇有地下连续墙叠合地下室外墙施工时,可采取单侧模板支撑方案。本文以厦门市新乘展示架加工制作车间工程作为研究对象,对单侧模板支撑技术具体的应用方法与工程质量控制要点进行分析,以期为同类项目提供参考和借鉴。
In the deep foundation pit engineering,if there is a continuous wall overlapped with the exterior wall of the basement,the unilateral formwork support scheme can be adopted.In this paper,Xiamen Xincheng display frame processing and manufacturing workshop project is taken as the research object,and the specific application methods and project quality control points of unilateral formwork support technology are analyzed,in order to provide a reference for similar projects.