期刊文献+

桥梁高大混凝土模板工程施工技术 被引量:2

Construction Technology of High Concrete Formwork of Bridge
下载PDF
导出
摘要 在设计高大模板支撑的过程中,要满足模板支撑能够搭设跨度大、高度高的脚手架,还要保证在施工过程中能够承载较大的载荷。结合具体桥梁施工实例,围绕高大混凝土模板工程施工技术展开详细探讨,并针对混凝土施工中容易出现的问题及其措施进行简要分析。 In the process of designing the high formwork support, it is necessary to meet the requirements that the formwork support can erect the scaffold with large span and high height, and also ensure that it can bear large load in the construction process. Combined with the concrete bridge construction example, this paper discusses the construction technology of high concrete formwork in detail, and analyzes the problems and measures that are easy to appear in the concrete construction.
作者 张涛 ZHANG Tao(The Third Engineering Company of CCCC Fourth Harbor Engineering Co.Ltd.,Zhanjiang 524005,China)
出处 《工程建设与设计》 2020年第3期216-218,共3页 Construction & Design for Engineering
关键词 桥梁 高大混凝土模板 吊装与拼接 bridge high concrete formwork hoisting and splicing
  • 相关文献

参考文献2

二级参考文献6

共引文献8

同被引文献4

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部