摘要
利用因子分析法建立建筑施工系统风险评价指标体系,结合改进的突变级数法定量地对建筑施工系统进行风险评价和实证分析,最后提出建筑施工系统安全风险的管控重点和干预措施。
This paper uses factor analysis method to establish the risk evaluation index system of construction system.Combined with the improved catastrophe progression method,the risk evaluation and empirical analysis of building construction system are carried out quantitatively.Finally,the key points and intervention measures for the control of the safety risk of building construction system are proposed.
作者
张龙申
陈伟珂
高双
ZHANG Long-shen;CHEN Wei-ke;GAO Shuang(School of Management,Tianjin University of Technology,Tianjin 300384,China)
出处
《价值工程》
2020年第5期98-100,共3页
Value Engineering
基金
国家社会科学基金(17BGL210)
关键词
建筑施工系统
因子分析
突变级数法
风险评价
the construction system
factor analysis
catastrophe progression method
risk assessment