斜塔柱施工主动撑拉杆优化设计 被引量:2

Optimization Design of Active Bracing Tie Rod in Construction of Inclined Tower Column
下载PDF
导出
摘要 为解决倾斜塔柱在施工过程中混凝土拉应力超限和成桥应力不佳的问题,提出基于混凝土拉应力限值和施工安装条件进行主动撑杆或主动拉杆的安装位置和预加力的初步设计,以成塔后的应力为目标对预加力进行优化。以斜拉桥花瓶式桥塔为例进行实桥的主动撑杆和拉杆的设计及优化,结果表明,该方法能有效主动控制施工过程中的混凝土最大拉应力和改善成塔后塔柱的应力状况。 In order to solve the problems of exceeding the limit value of concrete tensile stress and poor stress of completed bridge in the construction process of inclined tower column,this paper puts forward the preliminary design of installation position and pre force of active strut or active tie rod based on concrete tensile stress limit and construction and installation conditions,and optimizes the pre force with the stress after tower construction as the goal.Taking the vase type pylon of cable-stayed bridge as an example,the design and optimization of the active strut or tie rod of the real bridge are carried out.The results show that the method can effectively control the maximum tensile stress of the concrete in the construction process and improve the stress condition of the pylon after the pylon is built.
作者 周马生 叶成银 杨小刚 ZHOU Masheng;YE Chengyin;YANG Xiaogang(China Road&Bridge Co.,Ltd.,Beijing 100001,China)
出处 《施工技术》 CAS 2019年第23期37-41,共5页 Construction Technology
关键词 桥梁工程 斜拉桥 倾斜塔柱 撑杆 结构计算 bridges cable stayed bridges inclined tower columns struts structure calculation
  • 相关文献

参考文献9

二级参考文献28

共引文献76

同被引文献10

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部