期刊文献+

采煤机行星架的结构性能的分析与优化 被引量:2

Analysis and Improvement of the Structure of the Carrier of the Shearer
下载PDF
导出
摘要 以采煤机结构组成为基础,通过采用PROE和ABQUS软件建立采煤机行星架的仿真模型,对行星架使用过程中的结构特性进行仿真分析研究。结果表明,行星架在运行过程中,在较多位置出现了应力集中、应力及结构变形分布不均匀等现象,并由此对行星架结构提出了优化改进建议。该研究可对掌握采煤机行星架的变化规律、提高采煤机的生产效率以及后期进一步开展采煤机的其他关键部件性能研究提供研究思路。 On the basis of the structure of the coal mining machine,and the simulation and analysis of the structure characteristics of the carrier are carried out through the establishment of the simulation model of the carrier of the coal mining machine.The results show that,during the operation,the stress concentration,stress and structural deformation distribution of the planet carrier are not uniform,and the structure of the planetary frame is optimized and improved.It is of great significance to master the changing law of the carrier of the coal mining machine and to improve the production efficiency of the coal mining machine.It is of great significance to master the changing law of the carrier of the coal mining machine and to improve the production efficiency of the coal mining machine,and also provides a research thinking for further research on the performance of other key components of the coal mining machine in the later stage.
作者 梁刚刚 Liang Ganggang(Fenhe Muti-Business Co.,Ltd.,Shanxi Branch,Hongtong Shanxi 041602)
出处 《机械管理开发》 2019年第12期117-118,共2页 Mechanical Management and Development
关键词 煤矿 采煤机 行星架 coal mine coal mining machine planet carrier
  • 相关文献

参考文献2

二级参考文献22

共引文献8

同被引文献19

引证文献2

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部