摘要
隧洞涌水是TBM施工中主要应对的安全风险和施工难点。结合桂中治旱乐滩水库引水灌区一期工程北干渠窑瓦~六浪隧洞工程实例,论述了TBM施工隧洞内在刀盘前方采取全断面超前分段注浆处理的方法与过程,并分析了处理效果。
Water gushing is the major safety risk and problem of TBM construction. Quyaowa-Liulang tunnel is one of the 1 st-stage works of Letan Reservoir Irrigation Project. Taking the construction of this tunnel as example, the authors discuss the method and process of full-section advance sectional grouting in front of the drill during TBM construction, and analyze the treatment effects.
作者
王松茂
甘宇程
WANG Song-mao;GAN Yu-chen(Guangdong No.2 Hydropower Engineering Company,LTD.,Guangzhou 511340,China)
出处
《广西水利水电》
2019年第6期36-38,42,共4页
Guangxi Water Resources & Hydropower Engineering