期刊文献+

立体多水平分支定位孔快速封堵特大突水点技术 被引量:4

Technique of Fast Sealing and Plugging Super-large Water Inrush Point by Three-dimensional Multihorizontal Branch Locating Hole
下载PDF
导出
摘要 鹤壁某矿1309工作面发生突水事故,突水量1 700~1 950 m^3/h,突水峰值为4 291 m^3/h,导致 淹井。针对突水点位置及突水通道不确定、突水量特大、水压高、地质构造极复杂(隐伏构造突水)等 情况,采用垂向钻孔和立体多水平定向分支钻孔相结合的快速封堵突水点技术,以堵源为主,查堵结合, 对突水点所在区域底板奥灰、L2灰岩含水层及F1061断层带主要导水通道进行立体化的注浆封堵与加固 ,形成帷幕切断深部突水通道,堵水效果显著,达到了快速注浆堵水排水复矿、减少矿井排水量的目的。 Water inrush accident occurred at 1309 working face of a coal mine in Hebi city,with the sudden water amount between 1700 m^3/h and 1950 m3/h,and the water inrush peak value of 4291 m^3/h,resulting in flooding well.According to the uncertain location of water inrush point and water inrush channel,large amount of water inrush,high water pressure,complicated geological structure(concealed structure water inrush)and so on,the vertical borehole and stereoscopic branch of horizontal directional drilling with the combination of rapid plugging water bursting point technology is used.Based on the source plugging and combined with plugging,three-dimensional grouting sealing and reinforcement is carried out for the Ordovician limestone,Ln limestone aquifer and main water channel of FI06i fault zone where the water inrush point is located,and the curtain is formed to cut off the deep water inrush channel,and the water blocking effect is remarkable,which achieves the purpose of quick grouting water blocking and drainage and mine discharge reduction.
作者 黄北海 房朝飞 贺龙 HUANG Beihai;FANG Chaofei;HE Long(.Jiaozuo Shenlong Hydrogeology Company,Jiaozuo 454171,China)
出处 《煤矿安全》 CAS 北大核心 2019年第11期88-90,94,共4页 Safety in Coal Mines
关键词 钻具组合 定向钻进 多分支水平孔 注浆封堵 特大突水点 assembly of drilling tools directional drilling multi-branch horizontal hole grouting plugging extremely large water bursting point
  • 相关文献

参考文献9

二级参考文献12

共引文献47

同被引文献52

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部