摘要
主要对恰甫其海水电站直流系统存在问题进行分析,根据现行相关国家标准、行业规程制定升级改造方案,并介绍施工过程及升级改造后的情况。
The existing problems of DC system of Qiafuqihai Hydropower Station are analyzed in the paper. According to the current national standards and industry regulations, the upgrade scheme, construction process and post-upgrade situation of DC system are described.
作者
陈福建
CHEN Fu-jian(Xinjiang Yili River Basin Development and Construction Authority)
出处
《大坝与安全》
2019年第4期68-69,共2页
Dam & Safety