2Van Campen D H.Systematic Bolt-Tighting Proce-dure for Reactor Vessle Flanges[D].The Delft,Neth-erlands:University of Technology,1969:10-15. 被引量:1
3Bibel G D,Ezell R M.An Improved Flange Bolt-upProcedure using Experimentally Determined Elastic In-teraction Coefficients[J].ASME J.Pressure VesselTechnol.,1992,114(4):439-443. 被引量:1
4Sayed A.Nassar,Ali A.Alkelani.Clamp Load Lossdue to Elastic Interaction and Gasket Creep Relaxationin Bolted Joints[J].ASME J.Pressure Vessel Techn-ol.,2006,128(3):394-401. 被引量:1
5Ali A.Alkelani,Sayed A.Nassar,Basil A,Housari.Formulation of Elastic Interaction between Bolts duringthe Tighting of Flat-face Gasketed Joints[J].ASMEJ.Mechanical Design,2009,131(2):1-9(021004). 被引量:1
6Takaki T,Fukuoka T.Effective Bolting up ProcedureUsing Finite Element Analysis and Elastic InteractionCoefficient Method[A].ASME Conference Proceedings[C].San Diego,California:American Society of Me-chanical Engineers,2004:155-162. 被引量:1