摘要
随着中国电网互联的不断深入,各种新能源也大幅接入,各种新能源也得到了广泛应用,由此电厂的发电计划也应适应新环境要求,以“三公”调度模型为基础,进行了基于电厂日负荷率的火电机组发电计划优化。概述发电计划与机组组合优化情况,针对实际算例分析基于电厂日负荷率的火电机组发电计划优化效果,结果满足电网实际运行需求。
With the deepening interconnection of China's power grids,various new energy sources are also widely connected,and various new energy sources have been widely used.Therefore,the power gen eration plan of power plants should also meet the new environmental requirements.Based on the"three public"dispatching model,this paper optimizes the power generation plan of thermal power units based on the daily load rate of power plants.This paper summarizes the situation of generation plan and unit combination optimization,and analyses the optimization effect of thermal power unit generation plan based on daily load rate of power plant according to actual example,the result meets the actual operation demand of power grid.
出处
《节能》
2019年第8期11-13,共3页
Energy Conservation
关键词
电厂日负荷率
火电机组
发电计划
“三公”调度
daily load rate of power plant
thermal power unit
power generation plan
three public dispatch