摘要 根据双向水泥搅拌桩桩机工作电流变化,判定水泥搅拌桩是否打入持力层。重点对双向水泥搅拌桩桩机内外钻杆工作电流进行分析,并对龄期后成桩进行取芯检测,双向水泥搅拌桩成桩质量优良,验证电流用于现场施工控制水泥搅拌桩桩长的实用性。 According to the working current change of the two-way cement mixing pile machine,whether thecement mixing pile is driven into the bearing layeror not is determined.The working current of the inner and outer drill pipe of the two-way cement mixing pile machine is analyzed,and the core is tested after the ageing.The quality of the two-way cement mixing pile is excellent,which verifies the practicability of the current used in site construction to control the length of the cement mixing pile.
作者 沈正伟 SHEN Zheng-wei(JSTI GROUP,Jiangsu Nanjing 210019 China)
出处 《山东交通科技》 2019年第4期71-73,共3页
关键词 高速公路 双向水泥搅拌桩 持力层 电流 软土地基 expressway two-way cement mixing pile bearing layer current soft ground
  • 相关文献

参考文献6

二级参考文献34

共引文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部