期刊文献+

基于粒子群算法的装配式建筑施工安全风险决策 被引量:26

Safety Risk Decision of Prefabricated Building Construction Based on Particle Swarm Optimization
下载PDF
导出
摘要 为研究建设项目施工中各风险因素之间的错综复杂关系,采取科学的风险控制策略降低建设项目施工安全风险,通过在分析装配式建筑施工安全风险因素的基础上,利用马尔科夫链和贝叶斯网络相结合的方法对风险因素的发生概率进行估算,以条件概率描述各风险因素之间的相关性,并构建安全风险损失-控制投入双目标优化模型,设计相应的算法并运用R语言编程求解。结果表明考虑风险相关性的优化模型,结合实际情况给出合理的配置策略,对提高装配式建筑施工安全风险决策有良好推进作用。 In order to study the intricate relationship between various risk factors in the construction of construction projects,a scientific risk control strategy was adopted to reduce the construction safety risks of construction projects.Markov chain and Bayesian network were utilized on the basis of analyzing the safety risk factors of prefabricated building construction.The conditional probability was used to describe the correlation between various risk factors,and the safety risk loss-control input double objective optimization model was constructed.The corresponding algorithm was designed and solved by R language programming.The results show that the optimization model considering risk correlation,combined with the actual situation to give a reasonable allocation strategy,has a good role in promoting the decision-making of building construction safety risk.
作者 吴溪 常春光 严昕 WU Xi;CHANG Chun-guang;YAN Xin(School of Management,Shenyang Jianzhu University,Shenyang 110168,China;School of Statistics and Management,Shanghai University of Finance and Economics,Shanghai 200433,China)
出处 《科学技术与工程》 北大核心 2019年第27期304-310,共7页 Science Technology and Engineering
基金 国家自然科学基金(51678375) 辽宁省自然科学基金项目(2015020603)资助
关键词 装配式建筑 施工安全 贝叶斯网络 马尔科夫链 风险相关性 粒子群算法 prefabricated building construction safety Bayesian network Markov chain risk correlation particle swarm optimization
  • 相关文献

参考文献4

二级参考文献19

  • 1王涛,陶薇.考虑随机因素的汽车悬架参数多目标稳健优化[J].振动与冲击,2009,28(11):146-149. 被引量:23
  • 2张立军,张天侠.车辆四轮相关时域随机输入通用模型的研究[J].农业机械学报,2005,36(12):29-31. 被引量:38
  • 3Bing L,Tiong R L K,Fan W W,et al.Risk management in international construction joint ventures[J].Journal of Construction Engineering and Management,1999,125(4):277. 被引量:1
  • 4Ling F Y Y,Hoi L.Risks faced by Singapore firms when undertaking construction projects in India[J].International Journal of Project Management,2006,24(3):261. 被引量:1
  • 5Van Horne J C,Wachowicz J M.Fundamentals of financial management[M].New Jersey:Pearson Education,2008. 被引量:1
  • 6Trindade A A,Zhu Y.Approximating the distributions of estimators of financial risk under an asymmetric Laplace law[J].Computational Statistics&Data Analysis,2007,51(7):3433. 被引量:1
  • 7Beasley M S.Fraudulent financial reporting(1998—2007):an analysis of US public companies[R].Orlando:Committee of Sponsoring Organizations of the Treadway Commission,2010. 被引量:1
  • 8HAN Peng,LIU Yisheng.Study on the risk analysis and prevention for international project[C]//Proceedings of the2011 International Conference on Information,Services and Management Engineering.Wuhan:Scientific Research Publishing,2011:1868-1887. 被引量:1
  • 9Williamson D.The COSO ERM framework:a critique from systems theory of management control[J].International Journal of Risk Assessment and Management,2007,7(8):1089. 被引量:1
  • 10Kabir G,Akhtar Hasin M A.Multi-criteria inventory classification through integration of fuzzy analytic hierarchy process and artificial neural network[J].International Journal of Industrial and Systems Engineering,2013,14(1):74. 被引量:1

共引文献27

同被引文献262

引证文献26

二级引证文献99

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部