摘要
根据工业硅电炉在正常生产过程中炉底易上涨、炉况的有效冶炼周期较短(3~6个月)等诸多问题开展技术分析。提出工业硅还原剂(石油焦及烟煤)冷压球团的试验研究,为下步工业硅炉试验提供基础依据。希望在行业交流学习中起到借鉴作用。
According to the furnace bottom is easy to rise in the normal production process of the industrial silicon electric furnace, the effective smelting cycle of the furnace condition is short(3~6 months) and other problems,technical analysis are carried out. The experimental research on cold pressed pellets of industrial silicon reducing agent(petroleum coke and bituminous coal) is proposed, which provides the basis for the next step of industrial silicon furnace testing. Hoping this paper can be used as a reference in industry exchange learning.
作者
麻林伟
陈运字
张文来
黄健
牛群峰
周潼
MA Linwei;CHEN Yunzi;ZHANG Wenlai;HUANG Jian;NIU Qunfeng;ZHOU Tong(Zhengzhou Xukun Jieneng Technologies Co.,Ltd.,Zhengzhou 450001,China;Shangnan Zhongjian Industrial Co.,Ltd.,Shangnan 726300,China;Henan University of Technology,Zhengzhou 450001,China)
出处
《铁合金》
2019年第5期11-13,共3页
Ferro-alloys
关键词
工业硅冶炼
炉底上涨
还原剂(石油焦、烟煤)
冷压球团
试验研究
industrial silicon smelting
furnace bottom rising
reductant(petroleum coke
bituminous coal)
cold pressed pellets
experimental study