综合管廊工程中超长顶管施工技术探究 被引量:2

Research on Construction Technology of Long Pipe Jacking in a Comprehensive Pipe Gallery Project
下载PDF
导出
摘要 结合某城市地下综合管廊工程,对顶管施工中质量控制的关键技术进行探讨。介绍了顶管施工工艺,并结合施工重难点,针对顶管方案验算顶进参数;分析了施工质量控制要点和相关防范措施。施工结果表明,采用超长距离顶管技术、泥水平衡顶管施工方式、触变泥浆技术顺利完成了顶管施工,取得了良好的施工效果,可供类似工程借鉴。 In terms of the underground comprehensive pipe gallery project of a city, the key technology of quality control in pipe jacking construction is discussed. This paper introduces the construction technology of pipe jacking, selects the scheme of pipe jacking and calculates the jacking parameters according to the important and difficult points of construction. The key points of construction quality control and relevant preventive measures are analyzed. The construction results show that the construction of pipe jacking has been successfully completed by adopting extra-long distance pipe jacking technology, mud-water balance pipe jacking method and thixotropic mud technology, and good construction results have been obtained, which can be used for reference for similar projects.
作者 王晓峰 邓祝君 于乃鹏 WANG Xiao-feng;DENG Zhu-jun;YU Nai-peng(Nantong Fifth Construction Engineering Co., Ltd., Nantong 226400, China)
出处 《南通职业大学学报》 2019年第3期100-104,共5页 Journal of Nantong Vocational University
关键词 超长顶管 城市综合管廊 泥水平衡式 顶管施工技术 泥浆平衡系统 extra-long distance pipe jacking urban integrated pipe gallery mud-water balance type pipe jacking mud system
  • 相关文献

参考文献10

二级参考文献25

共引文献13

同被引文献15

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部