摘要
从顶管施工技术原理和三种平衡理论出发,详细介绍了顶管施工技术实施过程,包括前期准备、设备的安装与调试、顶管井的施工和施工步骤的技术特点及技术流程,指出该技术对于保证市政工程项目的顺利实施具有显著意义。
The principle and three kinds of balance theory of pipe jacking construction technology are set out in this paper. The technical feature and process of implementation process of pipe jacking construction technology are proposed, such as initial preparation, equipment installation and debugging, top tube well construction and construction steps. The pipe jacking construction technology has a significant meaning to ensure the smooth implementation of the municipal engineering project.
作者
杜红燕
Du Hongyan(Taiyuan Municipal Public Works Quality Supervision Station , Taiyuan 030012, China)
出处
《山西建筑》
2018年第9期56-57,共2页
Shanxi Architecture
关键词
顶管
施工技术
市政工程
pipe jacking, construction technology, municipal engineering