摘要
重庆中交中央公园工程为蝶式异形超高层住宅建筑,采用集成式附着升降操作平台作为外立面施工防护.施工过程中,针对工程实际情况,通过优化操作平台折叠单元规格尺寸、附墙支座位置、不同支座加固形式、适当改变安装顺序,采用升降操作平台智能爬升控制,保证了施工安全高效,经济效益良好.
Chongqing Zhongjiao Central Park Project is a butterfly-shaped super-high-rise residential building, which adopts integrated attachment lifting operation platform for external facade construction protection. In the construction process, according to the actual situation of the project, the intelligent climbing control of the lifting operation platform can be ensured by rationally optimizing the size of folding unit of the operation platform, the position of supporting wall, the reinforcement forms of different supports, changing the installation sequence appropriately, thus ensuring the safe and efficient construction of the project, generating objective economic benefits.
作者
赵斌
乔稳超
燕利珍
ZHAO Bin;QIAO Wen-chao;YAN Li-zhen(China Construction Second Engineering Bureau Ltd.,100010,Beijing,China)
出处
《建筑技术》
2019年第10期1192-1195,共4页
Architecture Technology