由于矿体的走向长度远大于矿房尺寸,因此将充填体力学问题简化为平面应变问题,推导出充填体在一侧暴露情况下的底部剪应力表达式。结合傲牛铁矿的开采技术条件,通过对不同配比充填体的底部剪应力随矿房高度与宽度变化关系的分析,从而确定矿房与矿柱高为40m,宽分别为40m和30m。该研究成果可以为类似金属矿山开采提供理论依据。
The mechanical problem of the filling body is simplified to the plane strain problem because of the length of the ore body is much larger than the size of the stope,and the internal shear stress expression of the filling body under one side exposure is derived.Combined with the mining technical conditions of Aoniu iron mine,and through the analysis of the relationship between the bottom shear stress of different proportions of filling body and the height and width of the mine,it is determined that the height of the mine and the pillar is 40 m and the width is 40 m and 30 m respectively.The research results can provide theoretical basis for similar metal mining.
作者
周乐
许卫军
姚维
邱景平
任玉东
ZHOU Le;XU Weijun;YAO Wei;QIU Jingping;REN Yudong(School of Materials & Metallurgy,Northeastern University,Shenyang110819,China;Changchun Gold Research Institute,Changchun 130012,China;Lingyuan Rixing Mining Co.,Ltd.,Chaoyang 122000,China)
出处
《中国矿业》
北大核心
2019年第10期138-141,179,共5页
China Mining Magazine
基金
国家自然科学基金资助项目资助(编号:51774066)
国家重点研发计划项目资助(编号:2018YFC0604604)
关键词
阶段嗣后充填法
充填体强度
单侧暴露
采场尺寸
stage subsequent filling mining
strength of backfill
unilateralexposure
stop size