4Tang L X, Liu J Y, Rong A Y, et al. A review of planning and scheduling systems and methods for integrated steel production [J]. European Journal of Operational Research (S0377-2217), 2001, 133(1): 1-20. 被引量:1
5Lee H S, Murthy S S, Haider S W, Morse D V. Primary production scheduling at steelmaking industries [J]. IBM Journal of Research and Development (S0018-8646), 1996, 40(2): 231-52. 被引量:1
6Harjunkoski I, Grossmarm t E. A decomposition approach for the scheduling of a steel plant production [J]. Computers and Chemical Engineering (S0098-1354), 2001, 25(11-12): 1647-1660. 被引量:1
7Soo Y Chang, Myong-Rae Chang, Yushin Hong. A lot grouping algorithm for a continuous slab caster in an integrated steel mill [J]. Production planning & control (S0953-7287), 2000, 11 (4): 363-368. 被引量:1
8Peter Cowling, Wafa Rezig. Integration of continuous caster and hot strip mill planning for steel production [J]. Journal of Scheduling (S 1094-6136), 2000, 3(4): 185-208. 被引量:1
9Lixin TANG, Jiaxiang LUO. A new ILS algorithm for cast planning problem in steel industry [J]. ISU International (S0915-1559), 2007, 47(3): 443-452. 被引量:1