摘要
根据高岭拦河闸重建工程消能工的自身特点,分析了消能工设计时的几个主要技术问题,包括消能工分级方式、河床下切影响、排水系统有效性、斜坡段水流平顺性、整体结构合理性等,并对这些主要技术问题进行了针对性的研究和设计优化,相对有效地解决了这些问题,可供类似工程参考。
According to the characteristics of energy dissipators in Gaoling Barrage Reconstruction Project,this paper sorts out some key technical problems in energy dissipator design,including number of energy dissipator stages,effect of river bed undercutting,effectiveness of drainage system,rationality of overall structure,flow smoothness in slope section,etc.this paper carries out targeted research and optimized design,and has solved the problems in a relative effective way,which can provide reference for similar projects.
作者
么振东
YAO Zhendong(Guangdong Hydropower Planning & Design Institute,Guangzhou 510635,China)
出处
《广东水利水电》
2019年第8期41-44,共4页
Guangdong Water Resources and Hydropower
关键词
高岭拦河闸
消能工
主要技术问题
Gaoling
barrage
energy dissipater
key technical problem