高岭拦河闸重建工程消能试验研究 被引量:4

Experimental Study on Energy Dissipation of Reconstruction Project of Gaoling River Sluice
下载PDF
导出
摘要 通过对高岭拦河闸重建工程的消能试验,提出了将拦河闸消力池按2种形式分区布置的方案,利用该方案中池底高程相对较低的中间单元消力池承担拦河闸的初始泄流任务,较好地解决了在设计方案布置泄放小流量时存在的消力池消能不足的问题。该方案不仅满足了拦河闸的消能要求,又节省了工程投资,可为同类工程的设计提供借鉴。 Based on the experimental study on energy dissipation of reconstruction project of Gaoling river sluice, stilling pool of river sluice is planned to arrange separately in two forms. A middle part of stilling pool, relatively low elevation ones in floor of pool, undertake the task of river sluice to discharge the initial flow, and it better solves the problem which is insufficient dissipation when discharge the low flow in design. Among the scheme, it is not merely fulfilIing the dissipation requirement of river sluice, but also saving investment of project, which provides reference for the similar projects design.
作者 罗林熙 陆汉柱 罗岸 朱红华 LUO Linxi LU Hanzhu LUO An ZHU Honghua(Guangdong Research Institute of Water Resources and Hydropower, Guangdong Engineering Laboratory of Estuary Hydropower, Guangzhou 510635, China)
出处 《广东水利水电》 2017年第8期17-21,26,共6页 Guangdong Water Resources and Hydropower
关键词 消力池 初始泄流 跌水 急流 泄流 消能 stilling pool initial discharge flow drop rapidly varied flow discharge flow dissipation
  • 相关文献

同被引文献14

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部