摘要
电力资源是社会生产生活的主要能源,随着社会发展速度的加快,对电力资源的需求量也不断增加。水电作为一种新型方式,在对其生产效率进行研究时,需要重点做好水轮机组的安装管理。水轮机组安装所需时间长,并且对技术要求严格,再加上生产环境的特殊性,很容易受外界因素的影响,必须要采取合理措施做好每个安装细节管理,减少不规范行为的产生,争取不断提高生产效率。基于此,文章主要针对水轮机安装质量控制重点进行了分析,以供参考。
power resource is the main energy of social production and life.With the acceleration of social development,the demand for power resources is also increasing.Hydropower,as a new type of method,should focus on the installation and management of hydraulic turbine units in the study of its production efficiency.The installation time of hydraulic turbine unit is long,the technical requirement is strict,and the particularity of production environment,it is easy to be influenced by external factors,so we must take reasonable measures to manage every installation detail well,and reduce the occurrence of nonstandard behavior.Strive to continuously improve production efficiency.Based on this,this paper mainly focuses on the quality control of hydraulic turbine installation.For reference.
作者
郭臣
GUO Chen(Gezhouba Group Mechanical and Electrical Construction Co.,Ltd.,Yunnan Lincang,675811,China)
出处
《数码设计》
2018年第2期87-87,97,共2页
Peak Data Science
关键词
水轮机安装
质量控制
重点
turbine installation
quality control
key points