高速铁路地下车站轨顶超大尺寸混凝土风道后施工技术策划 被引量:1

Post-Construction Technical Planning for Super-Large Concrete Air Duct on Rail Top of High-Speed Railway Underground Station
下载PDF
导出
摘要 在高速铁路地下车站轨顶现浇超大尺寸混凝土结构风道的后施工技术目前在国内外尚无相关案例。结合工程实际,从混凝土运输通道、浇筑方案对比、混凝土配合比、施工工况及顺序等方面,对轨顶混凝土风道后施工技术进行分析研究,并取得了良好的实施效果,可为类似工程提供借鉴。 At present, there is no relevant case at home and abroad about the post-construction technology of superlarge cast-in-situ concrete structure air duct on rail top of the high-speed railway underground station. According to the actual project, from the aspects of concrete transportation passage, pouring scheme comparison, concrete proportioning and construction conditions and sequence, the post-construction technology of concrete air duct on rail top is analyzed and researched, and good implementation effects are obtained, which can provide reference for similar projects.
作者 刘立新 LIU Lixin(China Railway Beijing Engineering Group Beijing Co., Ltd., Beijing 100073, China)
出处 《建筑施工》 2019年第6期1065-1066,共2页 Building Construction
关键词 高铁车站 轨顶混凝土风道 后浇筑 配合比 收缩裂缝 high speed rail station rail top concrete air duct post pouring mix proportion shrinkage crack
  • 相关文献

参考文献3

二级参考文献15

共引文献24

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部