期刊文献+

大倾角综放工作面过构造带技术措施研究 被引量:3

Study on Technical Measures for Overpassing Structural Zone in Fully Mechanized Caving Face with Large Inclination Angle
下载PDF
导出
摘要 3-807工作面回采期间揭露断层与向斜构造,采用FLAC3D数值模拟软件对工作面过构造带时的垂直应力及塑性破坏区范围变化进行了研究。针对过构造带时垂直应力集中、塑性破坏范围变大的问题,提出采用工作面调斜开采、合理调整采煤机割煤和移架循环作业、强化刮板输送机管理等措施确保工作面安全、快速通过复合地质构造。 Faults and syncline structures were exposed during mining in 3-807 working face.The variation of vertical stress and plastic failure zone was studied by FLAC3D numerical simulation software.Aiming at the problems of vertical stress concentration and plastic damage scope increasing when passing through structural belt,measures such as adjusting inclination mining of working face,rationally adjusting shearer cutting and shifting frame cycling operation,and strengthening management of scraper conveyor are put forward to ensure safe and rapid passage of working face through composite geological structure.
作者 靳彦伟 Jin Yan-wei(Shanxi Province Changzhi Jingfang Coal Industry Co.,Ltd.,Shanxi Changzhi 047100)
出处 《山东煤炭科技》 2019年第6期80-81,86,共3页 Shandong Coal Science and Technology
关键词 综采 构造 措施 fully mechanized mining structure measures
  • 相关文献

参考文献4

二级参考文献33

共引文献54

同被引文献14

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部