摘要
分析了目前特高压交流工程施工机具现场的管理现状及存在的主要风险点,针对性地提出了“一图、一节点、一清单、一书、一库”的“五个一”管理理念,优化完善了现有施工机具管理模式,形成了较为完善的施工机具现场管理体系,促进特高压交流工程本质安全水平进一步提升。
This paper analyzes the current situation and main risk points of on-site management of construction machinery for UHV AC transmission project, specifically puts forward the "Five-One" management concept such as "one drawing, one node, one list, one book and one warehouse", with which the existing mode of construction machinery management is optimized, a relatively perfect on-site management system of construction machinery is established, promoting the improvement of the essential safety level of UHV AC transmission project.
作者
潘宏承
张尔乐
熊织明
江海涛
周万骏
王伟
李全
PAN Hongcheng;ZHANG Erle;XIONG Zhiming;JIANG Haitao;ZHOU Wanjun;WANG Wei;LI Quan(State Grid AC Construction Branch Corporation,Beijing 100032,China;Jiangsu Transmission and Distribution Engineering Company,Nanjing 210037,Jiangsu Province,China;Shandong Chengxin Engineering Construction Supervision Co.,Ltd.,Jinan 250000,Shandong Province,China)
出处
《电力安全技术》
2019年第5期6-9,共4页
Electric Safety Technology
关键词
特高压交流工程
施工机具
“五个一”管理体系
UHV AC transmission project
construction machinery
"Five-One" management system