摘要
合肥三水厂迁建工程取水泵站利用既有大房郢水库泵房并加以改造,改造方案不仅要考虑原有设计方案,还需对既有建筑结构进行深入分析。论文对既有泵站改造设计中需要注意的事项和体会进行了分析总结,为以后泵站改造设计提供参考。
Paper tanking the pump station of the relocation project of Hefei third water treatment plan as an example,in this project,people use the existing pumping station of Dafangying reservoir,and reconstruct it,the reconstruction scheme not only considerates the original design scheme,but also analyzes the existing building structure.This paper analyzes and summarizes the matters needing attention and experience in the reconstruction design of existing pumping stations,and provides reference for the reconstruction design of pumping stations in the future.
作者
王宏峰
蒋金辉
史义雄
WANG Hong-feng;JIANG Jin-hui;SHI Yi-xiong(China Railway Siyuan Survey and Design Group Co.Ltd.,Wuhan 430063,China)
出处
《工程建设与设计》
2019年第11期109-111,共3页
Construction & Design for Engineering
关键词
既有泵站
改造设计
要点分析
existing pumping station
reconstruction design
key points analysis