8Moak R. Hydraulic rigs allow for live well workover. Petroleum Engineer International, 1982 (4) : 67 -72. 被引量:1
9Leggett R B. Snubbing Unit Applications in Potentially High -Rate Gas Wells: A Case Study of the Anschutz Ranch East Unit. SPE 22824, 1991 : 59 -74. 被引量:1
10Maddox S D. An Emergency Escape System for an Elevated Workplace. SPE 27258, 1994:441 -451. 被引量:1