摘要
以新疆奇台电厂2×660 MW发电机组间冷塔加强环安装为对象,通过分析该工程实际情况,阐述了目前最适宜的安装方式及相应的提升设备技术,该技术有效解决了大型筒状加强筋高空安全、可靠安装问题,值得推广应用。
Taking the installation of the cold tower reinforcement ring between 2×660 MW generating units in Qitai Power Plant in Xinjiang as an example,through analyzing the actual situation of the project,this paper expounds the most appropriate installation method and the corresponding lifting equipment technology,which effectively solves the problem of safe and reliable installation of large cylindrical reinforcement bars at high altitude and is worthy of popularization and application.
作者
严李荣
李兴奎
吕振刚
郭世滔
马勇
周大海
梁涛
YAN Li-rong;LI Xing-kui;LU Zhen-gang;GUO Shi-tao;MA Yong;ZHOU Da-chai;LIANG Tao(Liuzhou Ouweim Machinery Co.,Ltd.,Liuzhou Guangxi 545006,China)
出处
《装备制造技术》
2019年第2期162-166,173,共6页
Equipment Manufacturing Technology
关键词
钢结构间冷塔
加强环
爬升机
cold tower between steel structures
reinforcing ring
climbing machine