煤矿井下巷道贯通测量误差预计及方案调整 被引量:8

Error Prediction and Scheme Adjustment of Break through Survey of Coal Mine Underground Roadway
下载PDF
导出
摘要 贯通测量精度对最终巷道贯通工程效果有着重要的意义,会对矿井建设和生产造成影响,需制订有效的测量方案。结合矿井实际测量工程,对贯通测量误差进行了预计,提出了导线测量方案,对比分析了各个方案的可行性。工程实践证明,所选贯通测量方案大幅度提高了巷道贯通精度,且简便易行,有效缩减了工程贯通测量任务量。 Break through survey accuracy is of great significance to the effect of the final roadway break through project,which will affect the mine construction and production,and an effective measurement plan needs to be developed.Combined with the actual measurement engineering of the mine,this paper predicted the break through survey error,proposed the traverse measurement scheme,and compared and analyzed the feasibility of each scheme.The engineering practice proves that the selected break through survey scheme has greatly improved the tunneling penetration accuracy,and is simple and easy to implement,effectively reducing the amount of engineering break through survey tasks.
作者 李君 LI Jun(Huipodi Coal Mine, Fenhe Coking Coal Co., Ltd. of Shanxi, Hongtong 041600, Shanxi, China)
出处 《能源与节能》 2019年第4期18-19,共2页 Energy and Energy Conservation
关键词 巷道贯通 误差预计 方案调整 roadway break through error prediction scheme adjustment
  • 相关文献

参考文献5

二级参考文献30

共引文献26

同被引文献44

引证文献8

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部