上海五角场万达影城改造施工与措施研究 被引量:1

Research on Reconstruction Schemes and Measures of Shanghai Wujiaochang Wanda Cinema
下载PDF
导出
摘要 上海五角场万达广场影城在商场正常营运期间进行施工改造,施工方案的确定需结合场地条件,并考虑对商家经营的影响。经修改设计及优化,确定切除原屋面架构梁柱及板、新增框架梁柱施工、新增屋面钢梁吊装、压型钢板铺设及看台施工的施工方案,达到节约工期和施工方便的目的。解决钢梁吊装、原屋面梁板切割等难题。此外,对改造工程中易发且难以解决的防雨堵漏措施展开讨论,并总结一些经验。 Reconstruction of Shanghai Wujiaochang Wanda Cinema is carried out in business operation. The construction schemes are determined in combination with the conditions of the site, and the influence of the business operation is considered. The construction scheme of removing the original roof frame beam and plate, adding frame beam and column, adding roof steel beam hoisting, press-type steel plate laying and grandstand construction is determined by modifying the design and optimizing the construction plan , it saves construction costs and shortens the construction time. The problems of lifting steel beam and cutting original roof beam plate are solved. In addition , the methods of preventing, anti?rain and water leakage are discussed , and some practical experience are summarized.
作者 魏磊 WEI Lei(Shanghai City Co.,Lid. of Wanda Real Estate Group Co.,Ltd.,Shanghai 200435,China)
出处 《施工技术》 CAS 2019年第6期105-108,共4页 Construction Technology
关键词 改造工程 安装工程 吊装 起重机 渗漏 模板 reconstruction installation hoists cranes leakage formwork
  • 相关文献

参考文献5

二级参考文献26

共引文献21

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部