220 kV变压器高压套管发热问题的分析与处理 被引量:4

Analysis and treatment on high voltage bushing heating for 220 kV transformer
下载PDF
导出
摘要 结合金凤220 kV变电站1号主变C相中压套管发热问题的案例,介绍了该台主变高压套管发热问题的原因与处理过程。通过对高压套管的解体及红外热成像检测的综合分析,确定了造成高压套管发热及最初影响检修人员对发热部位误判的原因,对此类问题的分析与处理提出了具体的建议,可提高运行设备的可靠性。 Combining with the case of medium voltage bushing of phase C No.1 main substation for Jinfeng 220 kV substation,the causes and treatment process were introduced.By the comprehensive analysis of the high voltage bushing disassembling and infrared thermal imaging test,the causes were confirmed that the high voltage bushing heating and the initial influence on the heating place judgement by the operators,and the concrete suggestions were proposed for the treatment to improve the reliability of the operating equipment.
作者 马超 赵学华 周明星 刘岩 MA Chao;ZHAO Xuehua;ZHOU Mingxing;LIU Yan(Yinchuan Power Supply Company of State Grid Ningxia Electric Power Co.,Ltd.,Yinchuan Ningxia 750011,China)
出处 《宁夏电力》 2018年第6期39-42,共4页 Ningxia Electric Power
关键词 电力变压器 高压套管 红外热成像检测 power transformer high voltage bushing infrared thermographic testing
  • 相关文献

参考文献4

二级参考文献5

共引文献18

同被引文献46

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部