摘要
以某可举办大型会议的五星级酒店项目的燃气三联供系统为例,介绍项目系统设计和设备选型情况,分析项目在实际运行中存在的过渡季和游客淡季变压器负载率偏低的问题和改进措施,总结燃气三联供系统在类似酒店项目的设计选型时需要注意的问题。
By taking the gas-fired Combined Cooling,Heating and Power(CCHP)system of a five-star hotel project that can hold large conferences as an example,the system design and equipment selection of the project are presented,the problems on the low load rate of transformer in transition season and the tourist off-season of the project in actual operation as well as the improvement measures are analyzed,and the problems to be noticed for design and selection of the gas-fired CCHP system in similar hotel projects are summarized.
作者
边涛
BIAN Tao(AECOM Beijing Office,Beijing 100025,China)
出处
《建筑电气》
2018年第12期34-38,共5页
Building Electricity
关键词
三联供系统
冷热电
以冷热定电
以电定冷热
应急电源
分布式能源
余热利用
变压器负载率
CCHP system
cooling,heating and power
electricity determined by cooling and heating
cooling and heating determined by electricity
emergency power supply
distributed energy resource
waste heat utilization
load rate of transformer