期刊文献+

三模块有轨电车调运及工装结构方案研究 被引量:1

Study of three-module tram lifting and transport scheme and tooling structure
下载PDF
导出
摘要 根据三模块有轨电车的结构特点,对三模块有轨电车整车调运及吊运工装方案进行了研究,设计了新型整车吊运工装和架车防护工装,使三模块有轨电车可以安全地实现整体吊运,同时避免三模块有轨电车转向架在运输过程中受到自身车体的冲击。吊运工装结构计算表明,工装结构合理,满足结构及运输安全要求。 Based on the structural characteristics of the three-module tram,this paper makes study on the three-module tram lifting and transport tooling,and a new vehicle swing and unwheeling protective equipment are designed,so that the whole the threemodule tram are safely carried out,avoiding impact damages of the three-module tram bogie in transport.The calculation of lifting fi xture structure shows that the structure of the tooling is proper,and satisfi es the structure and transport safety requirements.
作者 焦祎军 李亚学 于建方 周浩 汪康康 Jiao Yijun;Li Yaxue;Yu Jianfang
出处 《现代城市轨道交通》 2018年第8期25-28,共4页 Modern Urban Transit
关键词 有轨电车 调运 工装结构 方案研究 tram transport tooling structure scheme study
  • 相关文献

参考文献2

二级参考文献5

共引文献14

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部