摘要
按照国家能源局制定的海上风电发展目标,我国将加大海上风电的开发力度。海上测风塔是为获得场址范围内的风资源实测数据而建设的,海上测风塔的建设条件复杂,以EPC总承包模式进行海上测风塔工程建设存在较大风险,做好风险管理是工程建设顺利进行的必要条件。结合广东地区已建的几个以EPC总承包模式开展的海上测风塔工程管理实践,阐述了EPC总承包模式海上测风塔工程建设的主要工作内容以及工程不同阶段存在的相应风险,基于某海上测风塔工程风险管理实例,对海上测风塔工程建设风险管理进行了初步的探讨。结果表明,海上测风塔建设过程存在一定程度的风险,通过采取合理的风险管理措施可实现项目风险管理的目标,可供类似工程建设参考。
According to the established offshore wind power development goal of National Energy Administration(NEA),China will increase the intensity of offshore wind power development.Offshore wind tower(OWT)has been built to obtain the measured data of wind resources within the site.There are high risks during construction since the construction conditions of the OWT are complex.Proper risk management is a necessary condition for the successful construction of the OWT under EPC mode.In this paper,project management practices of OWTs in Guangdong under the EPC mode were used for demonstrating the main contents of the OWT EPC contract and the corresponding various risks in different stages.A preliminary study on risk management was made based on an OWT project risk management examples.The results are shown that there is a considerable degree of risk in the construction of OWT and the risk management objectives of the project can be achieved by adopting reasonable risk management measures.This work provides some guidance for further study on similar engineering project.
作者
张力
黄文贺
ZHANG Li;HUANG Wenhe(China Energy Engineering Group Guangdong Electric Power Design Institute Co.,Ltd.,Guangzhou 510663,China)
出处
《南方能源建设》
2017年第A01期168-173,共6页
Southern Energy Construction
基金
中国能建广东院科技项目"海上风电场前期
建设期EPC总承包风险管控与投融资管理"(EV03461W)