摘要
结合施工实例,总结、探讨大型菱形挂篮在大风高墩条件下的安装、拆除施工技术,对菱形挂篮的施工技术研究进行补充完善。
Rhombic hanging basket is a common construction tool,which has extensive application for long span bridge,such as continuous rigid frame bridge,cable-stayed bridge and arch bridge.Its application has been researched in many literatures,but on the other hand,the technology of installation and removal for that at great height under strong wind is analyzed based on engineering case in this paper,while also perfectly complemented those research.
作者
梁建文
LIANG Jian-wen(First Branch, Guangdong Provincial Changda Highway Engineering Co.,Ltd., Guangzhou 511431, China)
出处
《佛山科学技术学院学报(自然科学版)》
CAS
2017年第4期8-13,共6页
Journal of Foshan University(Natural Science Edition)
关键词
菱形挂篮
大风
高墩
连续刚构桥
矮塔斜拉桥
吊装
拆除
rhombic hanging basket
strong wind
high pier
continuous rigid frame bridge
cable-stayed bridge
hoisting
removal