该文结合台头煤焦有限责任公司的工程实例,分析高水充填工艺的充填效果,结果表明高水充填良好地控制了上部覆岩的移动变形,希望能为其他相似矿井生产的开展提供借鉴与参考。
Combined with the engineering example of Taitou coke Co., Ltd., based on a thorough analysis of the highwater filling process,the filling effect were analyzed. The results show that high water filling on the upper cover rockmoving deformation has the good control effect. Hope to provide reference and reference for other similar production.
作者
闫亚鹏
Yan Ya-peng(Shanxi Xiangning coking coal Refco Group Ltd, Shanxi Xiangning 042100)
出处
《山东煤炭科技》
2016年第10期163-164,172,共3页
Shandong Coal Science and Technology
关键词
建筑物下
充填开采
包式充填
under the buildings
filling mining
package filling