摘要
本文以安砂水电站3号机组改造过程中的水轮发电机组安装测量要求和测量方法为例,介绍了在水轮发电新机组安装中为确保机组圆度、水平度、高程及垂直度优良的精密安装测量要求与方法。
In this paper,for example with the measurement requirements and measuring method in installed transformation process of No.third turbine generator unit of Ansha hydropower station,introduced in the new hydro unit installation to ensure its precision installation requirements and the excellent measuring method.of roundness,levelness,verticality and elevation.
出处
《水电自动化与大坝监测》
2014年第6期12-15,共4页
HYDROPOWER AUTOMATION AND DAM MONITORING
关键词
水轮发电机
安装测量
圆度
水平度
垂直度
Hydro generator
measurement
roundness
levelness
verticality