期刊文献+

论铁路建设项目全过程的投资控制和管理 被引量:5

A Brief Discussion on Investment Control and Management in the Whole Process of Railway Construction Projects
下载PDF
导出
摘要 铁路工程投资应从三个阶段来控制 ,即 :投资决策阶段是整个工程投资管理的源头 ,需要科学决策。设计阶段是整个工程投资管理的基础 ,需要优化比选 ,合理选择方案。施工阶段是整个工程造价管理的根本 ,必须精打细算。 Railway project investment should be controlled in three phases. They are the phase of investment decision, the phase of design and the phase of construction. Investment decision is the origin of the entire project, which needs a scientific decision process. The phase of design is the basis of the entire project management, which requires careful selection of options. The phase of construction is the essence of the project management, which rely on careful calculation of cost
作者 周岚
出处 《湖南大学学报(社会科学版)》 2002年第5期60-62,共3页 Journal of Hunan University(Social Sciences)
关键词 铁路项目 全过程 投资控制 railway project entire process investment control.
  • 相关文献

参考文献3

  • 1徐大图主编..工程造价的确定与控制[M].北京:中国计划出版社,1997:266.
  • 2黄如宝等.建设项目投资控制原理、方法与信息系统[M].上海:同济大学出版社,1994. 被引量:1
  • 3宋俊岳.建设项目评价与投资控制[M].北京:中国建筑工业出版社,1999. 被引量:1

同被引文献21

引证文献5

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部