措施盲斜井做为潘洛铁矿井下二期维简工程基建施工主要通道 ,要求设计合理、施工期短 ,同时达到坑内碴石内排的目的。介绍我矿根据矿山具体条件进行箕斗盲斜井设计。
The design of measure blind incline which is the main passageway of the capital construction of Panluo Iron Mine's second phase maintenance project is required to be rational,have short construction period and be able to rea lize the aim of internal discharge of inner waste rock.The design and construction of the skip blind incline according to the mine's conditions are described.
出处
《金属矿山》
CAS
北大核心
2002年第9期12-14,共3页
Metal Mine