后卸式箕斗在望儿山-430m盲管缆斜井的应用

Application of rear-dump skip in-430m blind incline of pipelines and cables in Wangershan mine
下载PDF
导出
摘要 在斜井基建施工过程中若使用矿车或串车提升,由于轨道铺设质量不高以及井口摘挂钩频繁,易发生人为安全事故,并且人工效率低。为了保证工程施工的安全,加快施工进度,将焦家金矿望儿山-430m盲管缆斜井提升由矿车提升改为后卸式箕斗提升,实现了自动卸载,避免了因井口手动摘挂钩引发的跑车事故,提高了作业效率。 If using tramcar or train for hoisting in incline construction,man-made safety accident happened easily and man efficiency is low because of the poor track construction quality and frequent hooking on-off.In order to ensure the safety of engineering construction and speed up the construction progress,the tramcar hoisting was replaced by the rear-dump skip hoisting in- 430 m blind incline of pipelines and cables in Wangershan mine,Jiaojia Cold Mine.Comparing with the tramcar hoisting,rear-dump skip hoisting realized automatic unloading,which avoided the accident caused by man hooking on-off on shaft top,and promoted the working efficiency.
出处 《中国矿山工程》 2015年第6期37-38 46,共3页 China Mine Engineering
关键词 盲斜井施工 矿车提升 后卸式箕斗 blind incline construction tramcar hoisting rear-dump skip
  • 相关文献

参考文献2

二级参考文献2

  • 1沈季良.建井工程手册(第二卷)[M].北京:煤炭工业出版社,1984.. 被引量:1
  • 2-.采矿设计手册,矿山机械卷[M].北京:中国建筑工业出版社,1988.. 被引量:1

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部