期刊文献+

高海拔山区风电场测风数据处理分析 被引量:2

Wind Data Processing and Analysis of Wind Farms in High Altitude Mountainous Areas
下载PDF
导出
摘要 在数据验证分析中,首先要进行评估时段的选取。针对高海拔山区风电场的特点,基于缺测或无效数据的具体情况以及周边测风塔、气象站等的资料情况,提出了评估时段选取的原则,以及具体分析的过程及方法。提供了多种可行、可靠的数据插补的方法。 In the data verification analysis the proper time interval for evaluation shall first be selected. The paper put forward the principles of selecting the time interval for evaluation, the practical analysis process and method according to the characteristics of the wind farms in high altitude mountainous areas, data availability, the data from the wind towers and the meteorological stations in their vicinity. The paper also put forward various practicable and reliable data interpolation methods.
作者 甘启娣 邱良 GAN Qi-di;QIU Liang(PowerChina Kunming Engineering Corporation Limited,Kunming 650051,Yunnan,China)
出处 《云南水力发电》 2018年第5期4-8,共5页 Yunnan Water Power
关键词 评估时段选取 数据处理 selection of time interval for evaluation data processing
  • 相关文献

参考文献4

二级参考文献17

共引文献31

同被引文献10

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部