期刊文献+

智能电表最优更换及备件库存联合决策 被引量:5

Joint Optimal Replacement and Spare Part Provisioning for Smart Meter
下载PDF
导出
摘要 智能电表是智能电网运行的关键部件,提高其可靠性和可用度对保证电力的持续不间断供应和准确电能测量至关重要。充足的智能电表库存是其换装与维修的基本保障。本文基于智能电表的故障特性和换装需求分析,建立了智能电表的最优更换与备件库存联合决策模型,并给出了优化方法,以求得可以使系统长期平均运营成本最小的最优更换与备件库存策略。 Electric power enterprises are developing towards the digital, information and intelligent directions. It is essential to improve the reliability and availability of smart meter to ensure uninterrupted supply of electricity and accurate power measurement as it is a key component of smart grid operation. The sufficient spare parts in- ventory of smart meter is the basic guarantee of the immediately installing and replacement. This paper established a smart meter inventory demand forecasting model on the basis of analyzing its fault characteristic and in- stalling requirements. A joint optimization decision model of preventive replacement as well as spare parts inven- tory policy is developed to obtain optimal management policy with a minimum long-term average operation cost for electric system.
作者 张晓红 白志霞 王潇炜 黄景立 蔺占芳 甘婕 ZHANG XIAO-hong;BAI Zhi-xia;WANG Xiao-wei;HUANG Jing-li;LIN Zhan-fang;GAN Jie(Division of Industrial and System Engineering,Taiyuan University of Science and Technology,Taiyuan 030024,China;Measurement Center of Shanxi Electric Power Company,National Grid,Taiyuan 030000,China)
出处 《运筹与管理》 CSSCI CSCD 北大核心 2018年第10期70-75,共6页 Operations Research and Management Science
基金 国家自然基金(71701140) 山西省基金项目(201601D021082) 太原科技大学博士启动项目(20152021 20162021) 太原科技大学校青年基金(20153015) 国网山西省电力公司项目(63053114007M)
关键词 智能电表 最优更换 备件库存 联合决策 优化 Smart meter Optimal maintenance Spare part provisioning Joint Decision Optimization
  • 相关文献

参考文献8

二级参考文献46

  • 1程嗣怡,索中英,吴华,张官荣,钟秋.基于协调近似表示空间的航空发动机故障诊断[J].航空动力学报,2009,24(7):1644-1648. 被引量:9
  • 2孙春林,崔珂,李耀华.基于粒子群优化算法的飞机维修计划编制优化[J].中国民航大学学报,2007,25(1):29-31. 被引量:3
  • 3盛骤 谢式千.概率论与数理统计[M].北京:高等教育出版社,1989.189-194. 被引量:145
  • 4Silver E A.Operations research in inventory management:a review and critique[J].Operations Research,1981,29(4):628-645. 被引量:1
  • 5Croston J D.Forecasting and stock control for intermittent demands[J].Operational Research Quarterly,1972,23(3):289-303. 被引量:1
  • 6Hua Z S,Zhang B,Yang J,et al.A new approach of forecasting intermittent demand for spare parts inventories in the process industries[J].Journal of the Operational Research Society,2006,57:889-898. 被引量:1
  • 7Thomas R W,Charles N S,Henry F.A new approach to forecasting intermittent demand for service parts inventories[J].International Journal of Forecasting,2004,20(3):375-387. 被引量:1
  • 8Timothy S Vaughan.Failure replacement and preventive maintenance spare parts ordering policy[J].European Journal of Operational Research,2005,161(11):183-190. 被引量:1
  • 9Thomas L C,Osaki S.An optimal ordering policy for a spare unit with lead time[J].European Journal of Operational Research,1978,2(6):409-419. 被引量:1
  • 10Park Y T,Park K S.Generalized spare ordering policies with random lead time[J],European Journal of Operational Research,1986,23(3):320-330. 被引量:1

共引文献55

同被引文献83

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部