深海采矿船平台与硬管连接点的弯矩计算方法 被引量:1

Moment Calculation Method of Deep-sea Mining Ship Platform and Hard Pipe Connection
原文传递
导出
摘要 对一艘由6 500 t甲板船改造成的采矿船平台及硬管结构建立仿真计算分析模型,运用AQWA水动力软件完成RAO预报,使用Orcaflex软件计算出三级海况下采矿平台与硬管连接点的最大弯矩。计算中把复杂的耦合问题用线性波浪理论处理,取得了比较好的效果。 The simulating calculation and analysis model of the mining ship platform and hard pipe structure transformed from a deck ship of 6 500 t is established. The RAO prediction is completed by using AQWA hydrodynamic software. Using Orcaflex software, the maximum bending moment of the mining platform and hard pipe connection under three stage sea state is calculated. The complex coupling problem is treated with linear wave theory in the calculation, which gets a better effect.
作者 叶帆 晏莎
出处 《船舶工程》 CSCD 北大核心 2018年第S1期303-306,共4页 Ship Engineering
基金 国家863计划项目:深海多金属结核和富钴结壳采掘与输运关键技术及装备(2012AA091201)
关键词 深海采矿平台 硬管连接点 最大弯矩计算 deep sea mining platform hard pipe connection point maximum bending moment calculation
  • 相关文献

参考文献7

二级参考文献28

共引文献158

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部