摘要 室内净高超过3. 6 m的人防工程,需要手算各主要构件的内力和配筋。首先介绍了门框墙中各构件的等效静荷载取值、边界条件、计算长度和计算简图,然后分析了人防外墙、临空墙和防护单元隔墙的计算模型,最后提出了人防其他构件设计的注意事项,供设计人员参考。 The civil air projects, interior net storey height more than 3.6 meters, is often encountered. In this case, the internal force and rein- forcement of the main components needs manual calculation. This paper first introduces the equivalent static load values, boundary condition, the length and the calculation diagram of the doorframe components, then analyzes calculation model of the exterior wall of civil air defence, blast- proof partition wall and protection unit partition wall, finally put forwards design considerations of the civil air other components, and provides the reference for the designers.
作者 潘红艳 Pan Hongyan(Institute of Architectural Design and Research,Taiyuan University of Technology,Taiyuan 030024,China)
出处 《山西建筑》 2018年第28期59-61,共3页 Shanxi Architecture
关键词 门框墙 上挡墙 加强梁 人防外墙 doofframe wall top retaining wall the strengthen pillar the exterior wall of civil air defence
  • 相关文献

参考文献2

二级参考文献17

  • 1于晓音,王挥,熊诚.人防工程防密门门框墙内力计算方法探讨[J].民防苑,2009(S1):27-30. 被引量:3
  • 2王有熙,许宏发,孙远.门框墙内力计算模型的比较分析[J].防灾减灾工程学报,2006,26(1):89-92. 被引量:6
  • 3中国人民共和国建设部.GB 50038-94人民防空地下室设计规范[S].北京:中国建筑工业出版社,1994. 被引量:1
  • 4中国人民共和国建设部.GB50038-94人民防空地下室设计规范[S].北京:中国建筑工业出版社,2003. 被引量:1
  • 5甘肃省人防工程设计研究院.DBJT25-98-2002甘02防-1防空地下室工程[S].甘肃:甘肃省工程建设标准管理办公室,2002. 被引量:1
  • 6天津市人防建筑科研设计院.DBJ29-31-2001津01防-1防空地下室工程图集[S].天津:天津市建设管理委员会,2001. 被引量:1
  • 7北京市建设设计标准化办公室.京04RFG1,5、6级人防工程防空地下室门框墙结构设计[S].北京:北京市建设设计标准化办公室,2004. 被引量:1
  • 8中国人民共和国建设部.GB 50038-2005人民防空地下室设计规范[S].北京:中国建筑工业出版社,1994. 被引量:1
  • 9总参工程兵第四设计研究院.RFJ05-2009人防工程设计大样图结构专业[S].北京:国家人民防空办公室,2009. 被引量:1
  • 10中国建筑标准设计研究院.07FG01-04防空地下室结构设计[S].北京:中国计划出版社,2007. 被引量:1