期刊文献+

垃圾焚烧发电厂垃圾坑加热解冻系统设计 被引量:4

Design for Waste Bunker Heating System in MSW Incineration Power Generation Plant
下载PDF
导出
摘要 我国北方地区垃圾焚烧发电厂,由于冬季天气寒冷,导致收运的垃圾结冰,无法及时融化,结冰垃圾在垃圾坑内无法充分发酵而降低入炉垃圾的热值,对焚烧炉的正常运行产生不良影响,基于现有的垃圾坑,利用汽轮机一抽和炉墙冷却风作为主要热源,布置加热解冻系统,给垃圾坑供热提高坑内温度,保证焚烧电厂正常的生产运营。 The MSW incineration power generation plant, the cold season of winter time lasts long, there is much ice block mixed in the waste when collected inside the plant, it is difficult to be melting in the waste bunker in time, and prevent the fermentation of waste, it reduces the heat value of feedstock, and affects the normal operation of incinerator. It gives the layout of heating system for the waste bunker, to increase the temperature and make the ice melting inside waste, ensure the normal production and operation of power plant.
作者 罗成俊 钱兵 李军 LUO Cheng-jun;QIAN Bing;LI Jun(China Tianying Inc.Hai'an Jiangsu 226600,China)
出处 《中国环保产业》 2018年第10期71-72,共2页 China Environmental Protection Industry
关键词 垃圾焚烧发电 垃圾坑 垃圾结冰 加热解冻 waste incineration power generation waste bunker ice in the waste heating and melting
  • 相关文献

参考文献1

共引文献6

同被引文献11

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部