摘要
为解决新大地公司矿井水处理站在运行期间存在的一些问题,如调节池的调节和预沉作用问题,处理能力低,消毒药品问题,安装工程及土建工程缺少质量保证,运行管理水平不高,设备老化等问题,需要采用一体化设备对现有的污水处理站进行提升改造,并提升管理水平,以保证其正常运行。
In order to solve the problems during the running of the mine water treatment station of Xiandadi Company, such as adjust the adjustment and the sink effect problem of pool, low processing power, disinfection medicine problem, installation engineering and civil engineering being lack of quality assurance, low operation and management level, equipment aging etc. Integration equipment is needed to promote transformation of existing sewage treatment station, improve management level, and ensure its normal operation.
作者
张彩红
Zhang Cai-hong(Heshun Xindadi Coal Mine Co., LTD., Yangquan Coal Group, Shanxi Heshun 03270)
出处
《山东煤炭科技》
2018年第9期189-191,共3页
Shandong Coal Science and Technology
关键词
矿井水处理站
问题
措施
mine water treatment station
problem
measures